Development of the CSC Docks

The drawings of the docks on this page were based on 1961, 1966, 1982 and 2002 dock plans and other information in the CSC archives.

1942 aerial photo of CSC dock

CSC started in the late 1930s with a single pier and about 8 slips where the current north gate is now located. The aerial photo (above) was taken in 1942.

 

By 1949, there were 12 davits, a pier to the north with a tool shed and rigging platform at the end, and a pier going out into the lake.

 

Davits were added to the north pier and a south pier was constructed during the 1950s. The configuration above with 51 davits was achieved by 1960.

 

With two separate piers, the club was turning into two separate clubs, one to the north and one to the south. A pier was constructed in 1961 to tie the two clubs together to ensure that they remained one. 18 additional davits were also added. Willis McQueen was commodore at the this time

 

Membership continued to grow as did the demand for additional davits. In the mid-1960s, 71 additional davits were added. The south pier was lengthened. Several davits were decked over in 1966 to provide additional common area near the north gate. This brought the total number of davits to 151 by the end of the 1960s.

 

There was a flood in 1975 that significantly damaged the club. The boardboat pads were added as part of the dock repairs.

 

Davits continued to be high demand. The last davit expansion program was completed in 1982, when club members built 29 new davits. Ted Perna led members in executing this project. They received one of the new davits for there effort. We have a total of 178 member owned davits.

 

The emphasis was then focused on improving the facilities and the new clubhouse, heads and tackroom, and committee boat davits were constructed in the late 1980s. The north gazebo, VIP lounge and junior/SMU lockers were built in the early 1990s. The davits on the south pier were turned to open to the north to make them more accessible. In addition, deck, pads and walkway renovations were started.

 

CSC Contruction 2007-08 from 2010 Google Satellite Image

New boardboat pads were added north of the Junior/SMU lockers in 2006. A launch ramp for Optis and board boats was also added at this time. The old pads were redone and expanded in 2007-08 and a new committee boat davit structure was completed in 2008. The photo from 2010 Google Satellite image shows the completed project.

 

The first aerial photo below was taken for the City of Dallas in 2003. The second is from Google Satellite taken in 2010.

Corinthian Sailing Club Arial Photo - City of Dallas

 

CSC Docks from 2010 Google Satellite

 